Everett Community College Business Development Model
Using AutoDesk Revit I worked with the project superintendent to create a 3D site logistics model of the Everett Community College project.

Everett Community College Structural Model
I used AutoDesk Revit to create an accurate and detailed structural concrete model while working on the Everett Community college project.

Bellevue Community College Structural Model
I used AutoDesk Revit to create a BIM model of the Bellevue Community College project which was later used for 3D MEP coordination as well as in the field through integrated work plans.

Everett Community College Integrated Work Plans
I used the AutoDesk Revit model I created of the Everett Community College project to generate integrated work plans for the field. Custom project parameters were used to track the portions of the model that required review, or were affected…

SPSCC Structural Model
While on the South Puget Sound Community College project, I used Autodesk Revit to create a detailed structural and architectural model from the 2d construction documents. This model was later used for 3D MEP coordination as well as in the…

Bellevue Community College Site Logistics Model
I created a site logistics model of the Bellevue Community College project using AutoDesk Revit.

Shoreline City Hall Business Development Model
As part of a design build team I assisted the project architect by creating a 3D Revit model from conceptual design drawings. Construction site logistic information was then later added to this model.

Seattle University Library Business Development Model
I used AutoDesk Revit to create a construction site logistics model of the Seattle University project. This model was used to communicate to the University the plan to execute the construction without affecting the student’s or staff’s safety or ability…

Tulalip Casino Hotel Structural Model
I was responsible for modeling the structural concrete model of the Tulalip Hotel Expansion project using Autodesk Revit. This model was then integrated with a structural steel model, shown in blue, which was provided by the steel detailer on the…

Tulalip Hotel Integrated Work Plans
I generated integrated work plans for all concrete work throughout the 114,000 sqft first floor of the Tulalip Casino Hotel expansion project.