Everett Community College Integrated Work Plans
I used the AutoDesk Revit model I created of the Everett Community College project to generate integrated work plans for the field. Custom project parameters were used to track the portions of the model that required review, or were affected…

Integrated Work Plan Standard
I was a major contributor to the company Integrated Work Plan standard. Created by design coordinators in the field, integrated work plan drawings are used to communicate coordinated information in the model to the field for construction.

Tulalip Hotel Integrated Work Plans
I generated integrated work plans for all concrete work throughout the 114,000 sqft first floor of the Tulalip Casino Hotel expansion project.

Everett Community Cancer Center Tower Crane Erection
While working on the Everett Community Cancer Care Center project I used the 3D BIM model with the superintendent to plan the location and erection of the two tower cranes used by the project.

Everett Community Cancer Center Integrated Work Plans
I used the Everett Community Cancer Care Center BIM model to coordinate all embeds, formwork anchors, and block outs in the four building cores. The coordinated model was then used to generate a series of integrated work plans which were…

UW Benjamin D. Hall Integrated Work Plans
I created a variety of drawings from the coordinated model of both the structure and the surrounding site for use directly in the field for construction.