
Everett Community Cancer Center Structural Model
I used Autodesk Architectural Desktop 2006 to model the steel and concrete structure of the Everett Community Cancer Care Center project.

Primavera P3 & NavisWorks TimeLiner Linking
I developed and documented a process to automate the linking of a 3D model with a Primavera P3 schedule into a 4D model in NavisWorks TimeLiner.

Tulalip Casino Hotel Expansion Business Development Model
I used SketchUp to create a site logistics model of the Tulalip Hotel Expansion project. The model was used to communicate the plan for routing traffic, storing materials, and otherwise allowing the existing Tulalip casino to continue operation without interruption…

UW Benjamin D. Hall Automated Layout
While working on the UW Benjamin D. Hall project I worked with the project surveyor in developing a process for automatic layout. This involved loading model data into surveying equipment so that it may be laid out directly in the…

UW Benjamin D. Hall Prefabrication
I worked as part of a team researching the use of prefabrication, which involved a trial prefabrication of a bathroom wet wall, and a full electrical room. The image below shows the sketchup model I created of the bathroom wall….

UW Benjamin D. Hall MEP Coordination
I led the 3D MEP coordination process of the first laboratory tenant installation of the UW Benjamin D. Hall project.

UW Benjamin D. Hall Integrated Work Plans
I created a variety of drawings from the coordinated model of both the structure and the surrounding site for use directly in the field for construction.

UW Benjamin D. Hall 4D Model
Using Navisworks Timeliner I combined the BIM model of the UW Benjamin D. Hall project with the projects Primavera P3 schedule into a 4D model.