Tulalip Hotel MEP Coordination
I led the 3D MEP coordination process using NavisWorks ClashDetective on the Tulalip Casino Hotel Expansion project.

Integrated Work Plan Standard
I was a major contributor to the company Integrated Work Plan standard. Created by design coordinators in the field, integrated work plan drawings are used to communicate coordinated information in the model to the field for construction.

Cave & Stereoscopic Displays
Developed the use of true 3D visualization of BIM models using dual projector passive stereoscopic displays.

SPSCC Site Logistic Model
I used Autodesk Revit to create a 3D site logistics model of the South Puget Sound Community college project.

Bellevue Community College Site Logistics Model
I created a site logistics model of the Bellevue Community College project using AutoDesk Revit.

Shoreline City Hall Business Development Model
As part of a design build team I assisted the project architect by creating a 3D Revit model from conceptual design drawings. Construction site logistic information was then later added to this model.

Seattle University Library Business Development Model
I used AutoDesk Revit to create a construction site logistics model of the Seattle University project. This model was used to communicate to the University the plan to execute the construction without affecting the student’s or staff’s safety or ability…

Tulalip Casino Hotel Structural Model
I was responsible for modeling the structural concrete model of the Tulalip Hotel Expansion project using Autodesk Revit. This model was then integrated with a structural steel model, shown in blue, which was provided by the steel detailer on the…

Project Websites
I took advantage of an existing wiki technology available at Mortenson to create a standard template for project websites. These websites were used across the company to exchange nearly all project related information including the 3D BIM models and coordination…

Tulalip Hotel Integrated Work Plans
I generated integrated work plans for all concrete work throughout the 114,000 sqft first floor of the Tulalip Casino Hotel expansion project.